Division of responsibilities

Mutual Obligations Protocol
Main \ Services \ Dividing list
PRESENTAION
Information
about MIC CENTER +
and services in one
pdf-file.
contacts
admin@mikcentr.ru
125424, Russia, Moscow, Volokolamskoe av., 73, 410 Room

Coordination of chassis/vehicle applicability

Division of responsibilities is required for obtaining VTA, VDSC. This document outlines the responsibilities for compliance with the technical regulation No. TR CU 018/2011 between the chassis manufacturer and the final vehicle manufacturer.

VIEW SAMPLE OF DIVIDING LIST

Division of responsibilities is processed with the company from which the base vehicle or chassis is purchased. The document records the numbers and names of the technical regulation requirements TR CU 018/2011. Different requirements are applied to each specific vehicle depending on its type. A list of requirements is compiled, and responsibility zones are defined. For example, the chassis or base vehicle manufacturer often takes responsibility for brakes or steering. The final manufacturer is responsible for their equipment, such as installing a van or a crane -manipulator.

MIC Center+ specializes in chassis approval for OJSC «MAZ», but we have experience with approvals for KAMAZ, MAZ, URALAZ, GAZ, UAZ and foreign manufacturers as well. Call us at +7 (495) 363 43 54, and we will provide free consultation on chassis or base vehicle applicability approval.

APPROVAL FOR OJSC «MAZ»

Extensive experience working with MAZ OJSC, preparation of turnkey approvals.

VTA

Mandatory assessment of vehicle compliance with TR CU No. 018/2011.
staff of experts
With specialised higher education and years of practical experience.
Our specialists will provide free consultation and guidance on how to process documentation quickly. Send us a request via email at admin@mikcentr.ru, through the "Get a free consultation" button, or call us at +7 (495) 363 43 54.
ACCREDITATION
Certification body and testing laboratory are included in the National Part of the Unified Register for conformity of products to TR CU 018/2011
20 years of experience
More than 400 manufacturers of special-purpose motor vehicles trust us for certification

LIST OF DOCUMENTS FOR REGISTRATION DIVIDING LIST

application
The application includes vehicle type designations and modifications, as well as contact information.

Company card
In any form, including the name of the legal entity, address, phone number, email, website, INN/KPP/OGRN/OKPO/OKVED, banking details, and the full name of the signatory.

SAMPLE OF COMPANY CARD

statutory documents
Copiers of INN, OGRN and Article of Association.

Specifications
The document describes technical operating standards and specifies product requirements. The document can be issued at MIC Center+.

SAMPLE SPECIFICATIONS

Operation manual
Vehicle operation manual. The document can be issued at MIC Center+.

SAMPLE OF OPERATION MANUAL

General drawing in three views
It is advisable to attach photos (if available).

SAMPLE OF DRAWING

certificates
Existing certificates of conformity for the product (if available).

Test reports
Control tests are designed to check the quality of vehicles and special-purpose vehicles. Certification tests are conducted to verify compliance with the declared technical specifications during manufacturing. The test results lead to a conclusion regarding the conformity of the specialized equipment to regulatory and technical documents.


ISO 9001 certificate
ISO 9001 CERTIFICATE (if available).

SAMPLE OF ISO 9001 CERTIFICATE

We will be happy to answer your questions

Please call us at +7 (495) 363 43 54 or email at admin@mikcentr.ru. We will get in touch with you shortly and provide information on the time required and the cost of document processing.
PRESENTATION
Information
about MIC CENTER +
and services in one
pdf-file.
efficiency
We value the customer's time and prioritize quality
Turnkey projects
We advise at every stage of our work
confidentiality
100% data security
Confidentiality